We have been a pioneer in the
construction of Mineral Processing Plants in the country. The first
indigenously designed and built mineral processing plant in the country, the
Fluorspar Beneficiation Plant for Gujarat Mineral Development Corporation was
built by ZENITH and since then ZENITH has built most of the major mineral
beneficiation plants in the country catering to various minerals like Zinc,
Lead, Copper, Uranium, Iron, Fluorspar etc.
Zenith has in its
manufacturing scope a wide range of equipment that caters to the Mineral
Beneficiation sector, which provides an in-depth knowledge of each unit process
that is involved in a mineral plant and enables ZENITH to design a well
balanced plant at optimum investment.
ZENITH has association with
some of the world leaders in technology for various equipment and has under its
manufacturing range critical Mineral Processing equipment like Slurry Pumps,
Thickeners, Grinding Mills, Crushers, Screens etc. to cater to the needs of the
complex plants. As a result, ZENITH can set up complex Mineral beneficiation
plants on turnkey basis from concept to commissioning stage.
ZENITH has tie ups with
several leading indigenous as well as International laboratories and test
centers and can today build Mineral plants from concept to commissioning
including design of flow sheet.
Recent prestigious
projects under execution :
The project involves Crushing, Screening, Grinding, Classification, Disposal of Sand Slime tailings up to Tailings Dam, Thickening of Uranium Ore at Kadapa, Andhra Pradesh and included equipment involving Primary Jaw Crushers, Cone Crushers, Conveyors, Rod & Ball Mills, Cyclones, Thickeners and total Electrical, Civil & Structural Construction for the system.
1.5 Million Tonnes
per annum lead – Zinc beneficiation plant at Rampura Agucha Mines, 4th stream
expansion, for M/s. Hindustan Zinc Limited, A Vedanta Group Company.
The project
involves Grinding, Classification, Flotation, Filtration, Reagent preparation
& Disposal of Tailings among other activities and includes equipment like
Grinding Mills, Flotation Cells, Thickeners, Cyclone and complete Electrical,
Civil & Structural Work on EPC basis.
2 Million Tonnes
per Annum lead – Zinc beneficiation plant at Sindesar Khurd Mines, for M/s.
Hindustan Zinc Limited, A Vedanta Group Company.
This is the green
field expansion project and scope of work includes complete area leveling &
grading work, primary crushing, fine crushing & screening, Grinding,
classification, flotation, concentrate thickening, filtration, disposal of
tailings from the tailings dam, water reclamation, in addition to full
Electrical, Civil & Structural Work for these.